Natural gas powers a 22 kW whole house generator, which costs about $11,269 to $16,269 after installation in Vermont. Here, electricians earn $35.27 per hour. That rate is 3% above the US mean of $34.37 and produces an electrician charge of $3,100 to $5,600.

$11,269 to $16,26922 kW installed in Vermont, natural gas
$5.00 / $9.9422 kW an hour at half load, gas / propane (EIA)
251 minwithout power per customer, 2025 (26th of 51, EIA)

Is 22 kW the right size? Answer three questions to size your house.

Installed prices by size in Vermont

Vermont prices for fuel at half load. A fuel table for each model comes from Generac. At 18 kW, 26 kW and 24 kW, the rated burn per hour stays at no more than the next size down, so hourly fuel use doesn't rise in step with kW.

SizeNatural gas, installedGas at half loadPropane, installedPropane at half loadFuel figures
10 kW$8,519 to $13,519$2.48/h$8,819 to $14,019$3.81/hGenerac Guardian 10 kW
14 kW$9,849 to $14,849$4.78/h$10,149 to $15,349$7.11/hGenerac Guardian 14 kW
18 kW$10,669 to $15,669$4.14/h$10,969 to $16,169$6.68/hGenerac Guardian 18 kW
22 kW$11,269 to $16,269$5.00/h$11,569 to $16,769$9.94/hGenerac Guardian 22 kW
24 kW$11,689 to $16,689$4.98/h$11,989 to $17,189$9.94/hGenerac Guardian 24 kW
26 kW$12,119 to $17,119$4.61/h$12,419 to $17,619$8.10/hGenerac Guardian 26 kW

What the 22 kW price covers in Vermont

Labor here is paid $35.27 an hour, 21st of 51, so it runs up to $100 above the US average.

Line, 22 kWNatural gasPropaneBasis
Generator$6,309$6,309Generac's listed price for the 22 kW bundle without the switch
Transfer switch$1,060$1,060Difference between Generac's prices with and without the switch
Electrician: switch, wiring, start-up$3,100 to $5,600$3,100 to $5,600published install ranges, adjusted to the Vermont hourly wage of $35.27 (BLS)
Fuel line$500 to $2,100$800 to $2,600Gas line running from the meter; propane line running from the tank
Pad and permit$300 to $1,200$300 to $1,200composite pad or slab, local fees
Installed$11,269 to $16,269$11,569 to $16,769propane leaves out the tank

Vermont fuel cost

FuelPrice22 kW an hourThree days
Natural gas$24.52 per 1,000 ft³$5.00$360
Propane$3.93 a gallon$9.94$716 (182 gal)

In Vermont, gas costs less: $5.00 per hour for a 22 kW at half load, compared with $9.94 for propane. Residential gas ranks 35th cheapest of 51 here.

Propane tankUsable at 80%22 kW at half loadFill at Vermont price
250 gal200 gal79 h$786
500 gal400 gal158 h$1,572

Tank hours by size.

Power outages in Vermont

251 min2025, all events
618 minten-year average
151 min2025 without major storms

During 2025, Vermont customers averaged 251 minutes without power. That total was lower than the US figure of 269; among 51, it ranked 26th highest. Major storms were behind 40% of that time, and on ordinary days it was 151 minutes. The worst year among the past ten was 2017, with 1,792 minutes without power. The ten-year average was 618 minutes, so 2025 came in 366 minutes below it.

Each year since 2016
YearMinutes out, all eventsRank of 51 statesWithout major storms
202525126th151
20248969th232
202348613th204
20229155th179
202121527th215
202015837th158
201933411th170
20189303rd358
20171,7923rd186
201619923rd199

Vermont utilities and their 2025 outages

UtilityCustomersMinutes outOutages eachMinutes per outage
Green Mountain Power Corp276,9852651.75151
Vermont Electric Cooperative, Inc40,9522512.06122

Customers of Green Mountain Power Corp lost power for 265 minutes in 2025, compared with 251 minutes for Vermont Electric Cooperative, Inc. The 2 largest utilities have a ratio of 1.1 to one, so they're close together. This makes the 251 minute state figure a fair guide. Across all utilities, the customer-weighted average customer lost power 2.06 times during the year. That's more often than the 1.35 average across the US. Outages on Green Mountain Power Corp lines averaged 151 minutes each, roughly 2.5 hours, and running a 22 kW at half load over that stretch costs $12.61 in gas.

Major FEMA disasters in Vermont since 2016

There were 14 major disaster declarations in all, including 8 severe storms and 6 floods. The latest was in September 2024, and COVID-19 is not included. Given 6 flood declarations, raise the generator pad higher than the local flood level; the permit office can give that level for the lot.

The counties named most often were Lamoille County (9), Franklin County (5), Addison County (6), Washington County (7), Orange County (9), Essex County (9), Orleans County (9) and Chittenden County (7).

DeclaredDisasterFEMA number
September 2024Severe Storms, Flooding, Landslides, and MudslidesDR-4826
September 2024Severe Storms and FloodingDR-4816
August 2024Severe Storm, Flooding, Landslides, and MudslidesDR-4810
April 2024Severe Winter StormDR-4770
March 2024Severe Storm and FloodingDR-4762
October 2023Severe Storms and FloodingDR-4744

Vermont, plus its neighbors

State22 kW on gas, installedWageMinutes out
Vermont$11,269 to $16,269$35.27251
Massachusetts$11,669 to $17,169$39.21122
New Hampshire$10,969 to $15,469$31.63151
New York$11,869 to $17,469$40.8247

Among 3 neighbors, 1 installs for less. New Hampshire comes in lowest at $10,969, whereas New York reaches the top at $11,869.

The information comes from BLS wages (May 2025), EIA natural gas (March through August 2026), EIA propane (October 26, 2026), EIA outage information, EIA-861, FEMA. Every state.